KEMA Labs White Paper on the new IEC TS63107
The scope of TS 63107 is described in our Low-Voltage White Paper, which clearly states the requirements for integration and testing of IAMS (Internal Arc Mitigation System) in Low-voltage PSC-assemblies according to IEC 61439-2, in order to demonstrate their correct operation
Connection requirements and key challenges to implement VRES into the grid
“Renewables: new connection requirements and main challenges to get them into the grid”, the new CESI webinar, will review the evolution of the connection requirements providing an outlook of the necessary grid impact and compliance studies to successfully get renewables into the network, in the context of the new paradigms, opportunities and challenges of the highly decarbonized electricity sector
Cybersecurity: risks and countermeasures for power utilities
We assess the main risks and countermeasures during the podcast Utility Cybersecurity organized by EnerNex, a CESI company leader in providing engineering, consulting, and research services to the electric power industry worldwide
CESI Webinar – Implementing HVDC grids to boost green energy
HVDC switchgear: Is it now time for revenge? will focus on the recent progresses in the verification of key protection and control components: HVDC circuit breakers and HVDC GIS
HVDC switchgear: Is it now time for revenge?
HVDC switchgear: It’s now time for revenge, our upcoming webinar, highlights the recent progresses in the verification of key protection and control components
CESI Webinar – The role of Green Oil for Power and Distribution Transformers
On Thursday, June 25, at 15.30 CEST our webinar will present to the audience the main technological steps in the development of sustainable dielectric fluids and the main improvements connected to their use in the electricity transmission and distribution sector